Call Us Today!
(800) 441-4880

Unique Paving Materials
Blog


UPM Permanent Pavement Repair Material

Posted on:

Demonstrating UPM® in Low Volume traffic and Light Loads.

Install Conditions: Dry Above 40ºF

Pavement Conditions: Poor Base Conditions caused failure

Installation Date: December 29, 2011

Time Elapsed: 2 ½ Months

Location: Topeka, KS, 4237 Colly Creek Dr.

10’X15’X8” Concrete failure, brought in gravel to help stabilize base

1

Dusted, prior to final lift

2

Feburary 7th, 2012