Demonstrating UPM® in Low Volume traffic and Light Loads.

Install Conditions: Dry Above 40ºF

Pavement Conditions: Poor Base Conditions caused failure

Installation Date: December 29, 2011

Time Elapsed: 2 ½ Months

Location: Topeka, KS, 4237 Colly Creek Dr.

10’X15’X8” Concrete failure, brought in gravel to help stabilize base

Unique Paving Materials final lift concrete

Dusted, prior to final lift

UNIQUE Pavement material

Feburary 7th, 2012