Demonstrating UPM® in High Volume traffic.
Install Conditions: Wet Above 40ºF
Pavement Conditions: Concrete Curb
Installation Date: February 13, 2012
Location: City of Mt. Sterling, KY, City Street
UPM was used to repair an area along a busy street against a concrete curb. The water was not removed from the repair area prior to applying the product. The repair was immediately opened to truck and passenger vehicle traffic.
BEFORE INSTALLATION
AFTER INSTALLATION
2 MONTHS AFTER INSTALLATION