Call Us Today!
(800) 441-4880

Unique Paving Materials
Blog


Shallow Pavement Repair Case Study

Posted on:

UPM®, Permanent Pavement Repair Material
Demonstrating UPM® for NH DOT District 2
Install Conditions: Dry Above 40ºF
Pavement Conditions: Shallow Repair
Installation Date: June 14, 2010
Time Elapsed: 19 Months
Location: Rumney, NH, Route 25 (Eastbound Lane)

UPM® is produced with ¼” Aggregate making it ideally suited for scabs or areas where the top coarse has delaminated.

BEFORE

1

84 DAYS LATER

2

1 YEAR LATER

3

19 MONTHS LATER

4