Shallow Pavement Repair Case Study

Posted on:

UPM®, Permanent Pavement Repair Material
Demonstrating UPM® for NH DOT District 2
Install Conditions: Dry Above 40ºF
Pavement Conditions: Shallow Repair
Installation Date: June 14, 2010
Time Elapsed: 19 Months
Location: Rumney, NH, Route 25 (Eastbound Lane)

UPM® is produced with ¼” Aggregate making it ideally suited for scabs or areas where the top coarse has delaminated.

BEFORE

pavement issue

84 DAYS LATER

repairing pavement

1 YEAR LATER

post pavement repair

19 MONTHS LATER

repair pavement material