Demonstrating UPM® permanent pavement repair material in High Volume traffic on an industrial road.
Install Conditions: Wet Above 40ºF
Pavement Conditions: Brick road, repair filled with water
Installation Date: October 15, 2011
Time Elapsed: 3 Months
Location: Winchester, KY, Industrial Road
This repair was immediately opened to truck and passenger vehicle traffic and endures constant high traffic daily. The rain water was not removed from the repair area.
BEFORE
AFTER
3 MONTHS LATER