Call Us Today!
(800) 441-4880

Unique Paving Materials
Blog


Brick Road Repair Case Study

Posted on:

Demonstrating UPM® permanent pavement repair material in High Volume traffic on an industrial road.
Install Conditions: Wet Above 40ºF
Pavement Conditions: Brick road, repair filled with water
Installation Date: October 15, 2011
Time Elapsed: 3 Months
Location: Winchester, KY, Industrial Road

This repair was immediately opened to truck and passenger vehicle traffic and endures constant high traffic daily. The rain water was not removed from the repair area.

BEFORE

1

AFTER

2

3 MONTHS LATER

3